Skip to content
Eastern Oregon Classifieds
Marketplace Search
    • Marketplace
    • Sign In
    • Favorite Listings
    • Saved Searches
    • My ads
    • Account Settings
    • Sign In
    • Place an Ad
  • Sign In
  • Sign In;}
    • Favorite Listings
    • Saved Searches
    • My ads
    • Account Settings
    • Sign In
  • Place an Ad
  • Farm Misc./General Misc
  • Help Wanted
  • Notices
  • Real Estate
  • Trailers/Rec. Vehicles
  • Trucks/Autos
Back
Featured

EO-14407 ADVERTISEMENT FOR BIDS CITY OF

Share

    Share Ad

  • Facebook
  • Twitter
  • reddit
  • WhatsApp
Print
EO-14407
ADVERTISEMENT FOR BIDS
CITY OF HERMISTON, OREGON
W. ORCHARD AVENUE WATER LINE REPLACEMENT

City of Hermiston
180 N.E. 2nd Street
Hermiston, Oregon 97838

General Notice

The City of Hermiston, Oregon (Owner) is requesting Bids for the construction of the following Project: W. Orchard Avenue Water Line Replacement.

Bids for the construction of the Project will be received until Tuesday, May 5, 2026, at 11:00 a.m., local time. At that time, the Bidders and Bid Amounts will be publicly viewed on QuestCDN.com and read aloud via video conference or conference call. The public viewing and reading of the bids received can be accessed via the web link and telephone number noted in the Q&A section on QuestCDN.com for the Project.

For this Project, Bids will be received and accepted ONLY via the online electronic bid service through QuestCDN.com. To access the electronic Bid Form, download the project documents and click Online Bidding at the top of the Project posting.

The Work for this Contract will generally consist of the replacement of approximately 3,400 linear feet (LF) of existing 4-inch ductile iron (DI) water line and approximately 400 LF of existing 6-inch DI water line, with new 8 inch DI piping. Work will also include the replacement of approximately 970 LF of 3/4 inch through 2-inch water service lines; installation of hydrants, valves, and other appurtenances; grind and overlay of approximately 3,300 LF of roadway; and installation of approximately 1,900 square feet of sidewalk.

The Contract is subject to the applicable provisions of ORS 279C.800 through ORS 279C.870, the Oregon Prevailing Wage Law.

The Project has an expected duration of 120 days.

Obtaining the Bidding Documents

Bidding Documents are available at http://www.andersonperry.com under the Bid Docs link. The digital Bidding Documents may be downloaded for a non-refundable payment of $50.00 by inputting QuestCDN eBidDoc Number 10141539 on the website. Assistance with free QuestCDN membership registration, document downloading, and working with the digital Project information may be obtained at QuestCDN.com, at 952-233-1632, or via e-mail at info@questcdn.com. The Bidding Documents will be available for download after April 6, 2026. No paper sets will be provided for bidding purposes.

Prospective Bidders are urged to register with the designated website as a planholder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. Only planholders registered with QuestCDN will be able to participate in vBids. The designated website will be updated periodically with addenda and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website.

The Issuing Office for the Bidding Documents is:

Anderson Perry & Associates, Inc.
Joshua Lott, P.E.
243 E. Main, Suite C, Hermiston, Oregon 97838
541-963-8309, jlott@andersonperry.com

Prospective Bidders may examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 8:00 a.m. and 5:00 p.m. or at the location listed below.

City of Hermiston, 180 N.E. 2nd Street, Hermiston, Oregon

The Owner is an equal opportunity employer. Minority and women-owned businesses are encouraged to bid. Minority and women-owned businesses should indicate they are a minority on the Planholders List.

Pre-bid Conference

A pre-bid conference for the Project will be held on Tuesday, April 21, 2026, at 2:00 p.m., at Hermiston City Hall, 180 N.E. 2nd Street, Hermiston, Oregon 97838. Attendance at the pre-bid conference is encouraged but not required.

Instructions to Bidders

For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

This Advertisement is issued by:

Owner: City of Hermiston, Oregon
By: Mark Morgan
Title: Assistant City Manager
Date: April 6, 2026
Publish April 8, 2026
Posted Online 6 days ago

Published in the East Oregonian

Explore more

Featured

EO-13828 NOTICE OF BUDGET COMMITTEE MEETING

EO-13828 NOTICE OF BUDGET...

A public meeting of the Budget Committee of the City of Hermiston, Umatilla County, State of Oregon, to discuss the budgets for the fiscal year July 1, 2025, to June 30, 2026, for the City of Hermiston and the Hermiston Urban Renewal Agency, will be held at City Hall located at 180 NE 2nd Street, Hermiston, Oregon. The meeting will take place on May 15, 2025, at 5:30 pm. The purpose of the meeting is to receive the budget message and receive comment from the public on the budgets. This is a public meeting where deliberation of the Budget Committee will take place. Any person may appear at the meeting and discuss the proposed programs with the Budget Committee. A copy of the budget documents may be inspected or obtained on or after May 15, 2025, at City Hall, 180 NE 2nd Street, Hermiston, Oregon between the hours of 8:00 am and 5:00 pm. This meeting notice is also being posted on the City's website at www.hermiston.or.us.

Publish May 14, 2025

A public meeting of the Budget Committee of the City of Hermiston, Umatilla County, State of Oregon, to discuss the budgets for the fiscal year July 1, 2025, to June 30, 2026, for the City of Hermiston and the Hermiston Urban Renewal Agency, will be held at City Hall located at 180 NE 2nd Street, Hermiston, Oregon. The meeting will take place on May 15, 2025, at 5:30 pm. The purpose of the meeting is to receive the budget message and receive comment from the public on the budgets. This is a public meeting where deliberation of the Budget Committee will take place. Any person may appear at the meeting and discuss the proposed programs with the Budget Committee. A copy of the budget documents may be inspected or obtained on or after May 15, 2025, at City Hall, 180 NE 2nd Street, Hermiston, Oregon between the hours of 8:00 am and 5:00 pm. This meeting notice is also being posted on the City's website at www.hermiston.or.us.

Publish May 14, 2025

Posted Online 48 weeks ago

Published in the East Oregonian

Featured

EO-13393 2024 Legal Notice of Unclaimed

EO-13393 2024 Legal Notice of...

EO-13393
2024 Legal Notice of
Unclaimed Capital Credits

Oregon Trail Electric Cooperative (OTEC) hereby gives notice of UNCLAIMED PAYMENTS OF CAPITAL CREDITS.

Pursuant to OTEC bylaws and policy, the names of OTEC Members who are entitled to capital credit retirements – but have not yet claimed their retirements – can be reviewed on the OTEC website.

If you are an OTEC member and current (or former) OTEC consumer, please visit www.otec.coop/capital-credits to search the list of Unclaimed Capital Credits. Members who have unclaimed capital credits may complete the Unclaimed Capital Credits form available at www.otec.coop/capital-credits.

Application for re-issuing funds owed may also be made at your local OTEC office or 4005 23rd Street, Baker City, Oregon 97814. Unless those persons named, or their heirs, claim payment no later than November 29, 2024, for unclaimed capital credits that have been available for a period of four years, or December 31, 2019, the unclaimed funds may be forfeited to the Cooperative. The Board of Directors has the discretion to contribute all, or a portion, of the forfeited funds to the Oregon Trail Electric Cooperative Scholarship Fund to benefit those served by the Cooperative.

If you have questions or need assistance, please contact OTEC at 541-523-3616.

Published: August 14, September 11, October 16, November 13, 2024

EO-13393
2024 Legal Notice of
Unclaimed Capital Credits

Oregon Trail Electric Cooperative (OTEC) hereby gives notice of UNCLAIMED PAYMENTS OF CAPITAL CREDITS.

Pursuant to OTEC bylaws and policy, the names of OTEC Members who are entitled to capital credit retirements – but have not yet claimed their retirements – can be reviewed on the OTEC website.

If you are an OTEC member and current (or former) OTEC consumer, please visit www.otec.coop/capital-credits to search the list of Unclaimed Capital Credits. Members who have unclaimed capital credits may complete the Unclaimed Capital Credits form available at www.otec.coop/capital-credits.

Application for re-issuing funds owed may also be made at your local OTEC office or 4005 23rd Street, Baker City, Oregon 97814. Unless those persons named, or their heirs, claim payment no later than November 29, 2024, for unclaimed capital credits that have been available for a period of four years, or December 31, 2019, the unclaimed funds may be forfeited to the Cooperative. The Board of Directors has the discretion to contribute all, or a portion, of the forfeited funds to the Oregon Trail Electric Cooperative Scholarship Fund to benefit those served by the Cooperative.

If you have questions or need assistance, please contact OTEC at 541-523-3616.

Published: August 14, September 11, October 16, November 13, 2024

Posted Online 86 weeks ago

Published in the East Oregonian

Featured

WC-30124 IN THE CIRCUIT COURT OF THE

WC-30124 IN THE CIRCUIT COURT OF...

WC-30124

IN THE CIRCUIT COURT OF
THE STATE OF OREGON FOR
THE COUNTY OF WALLOWA
In the Matter of
AGNES L. ROBERTS,
Deceased
Case no. 24PB08136

NOTICE TO
INTERESTED PERSONS

'NOTICE IS HEREBY GIVEN that the undersigned has been appointed personal representative. All persons having claims against the estate are required to present them, with vouchers attached, to the undersigned personal representative in care of Paige Sully PC, 213 W. Main Street, Enterprise Oregon 97828, within four months after the date of first publication of this notice, or the claims may be barred.

All persons whose rights may be affected by the proceedings may obtain additional information from the records of the Court, the personal representative, or the lawyers for the persona/l representative, Paige Sully PC.

Dated and first published on October 2, 2024.

/s/Susan Roberts
Personal Representative

Published: October 2, 9, 16, 2024

WC-30124

IN THE CIRCUIT COURT OF
THE STATE OF OREGON FOR
THE COUNTY OF WALLOWA
In the Matter of
AGNES L. ROBERTS,
Deceased
Case no. 24PB08136

NOTICE TO
INTERESTED PERSONS

'NOTICE IS HEREBY GIVEN that the undersigned has been appointed personal representative. All persons having claims against the estate are required to present them, with vouchers attached, to the undersigned personal representative in care of Paige Sully PC, 213 W. Main Street, Enterprise Oregon 97828, within four months after the date of first publication of this notice, or the claims may be barred.

All persons whose rights may be affected by the proceedings may obtain additional information from the records of the Court, the personal representative, or the lawyers for the persona/l representative, Paige Sully PC.

Dated and first published on October 2, 2024.

/s/Susan Roberts
Personal Representative

Published: October 2, 9, 16, 2024

Posted Online 79 weeks ago

Published in the East Oregonian

View more
Check back daily to see new goods and services, or to sell more stuff. Place an Ad
  • © 2026 by Eastern Oregon Classifieds
Powered by Powered by AdPerfect